Monday, March 26, 2007

Building An Elevator In Your Basement

I do apologize for the delay in posting this, but I've had some other things to take care of, including an interview. That's right, an interview. This is my first one since 2002, when I was interviews for my first award, The NY International Indie Film & Video Fest's top 50 Up and Coming Filmmakers of 2002. I was interviewed by Vapor Trail films for a fan film news magazine. There is no guaranteee it will air as quite a few people were interviewed, but it's pretty neat to be recognized. It was mostly concerning an upcoming project, which I will be announcing shortly, but I did touch on my current films.

A quick funny side. I had to re-shoot the film because I left the tape on a table adjacent to my computer and my older cat, Ali, knocked it down (she loves to knock down things on a table she is on. I think she considers it an insult for there to be anything on the table besides her. She's a full-blown diva, that one). Once I started, my wife heard some of it and laughed at me, telling me not to say "Um" so much. It was late, around 10:30, and I was tired, having been up til 1 the night before working on our SBA spoof. So I quickly reshot it, as it had to be in by Thursday.

Back to the elevator. I am sure a lot of you out there are wondering why I am building an elevator in my basement. Why not just go to a building and shoot inside an elevator? Well, I tried that. I went to 7 businesses and told them what I was needing to do, and I got the ok to shoot in the office, but not IN the elevator. I spoke to my realtor, who didn't think their building's landlord would mind us shooting in there. After a few weeks, the verdict was in. We could shoot in the office, but not in the elevator or the elevator shaft. We did get the ok to shoot inside her very modern & spacious office, so we shot the scenes that were in the office before and after the actual elevator scenes. (Thanks again Liz!!)

As we tried to brainstorm solutions, an idea suddenly came to me: my basement has steel beams that looked like the previous owner was going to use to section the room off into three distinct areas. The laundry room was to the left of the steps. When you come down the steps and face forward, in front of the laundry room was a sectioned off area that housed the oil tank and furnace. To the right of that was an area that had the steel beams and a doorway into a smaller room. It was here that we had an area that was deep enough and wide enough to serve as an elevator. So I measured it and purchased fabric from Wal-Mart. My realtor's office elevator was maroon, so I got a similar coloe and went about converting my basement.

Our production designer (and star) Andrew Miller helped in bringing the elevator to life. We took stock of what he we had to work with. The left side of the elevator had drywall haflway back, and the steel beams had holes so we could poke small holes in the fabric and use twist ties to secure it. The only problem came from the aforementioned left wall: it jutted out about 8 inches halfway to the back of the room. So I had to make a decision: cover the wall as is, or find a way to make the wall all one size. We decided to make it one size so we can make it as real as possible. I had an old wooden DVD storage rack that fit the length perfectly, so we attached that to the drywall and put the fabric over that, for a perfect fit.

The back of the left wall and the rear wall itself were both easy, as we could connect the fabric to the dry wall with push pins. We could hang the top of the fabric high enough out of frame on pipes with very large binder clips, as well as electric wiring twist ties. We ended up using those ties on the right wall, which we attached to the right wall. There was a piece of ductwork hanging above the right wall, but we taped fabric to it, and the way it's affixed, you can't tell that it's not attached to the right wall itself.

For the floor, which is unfinished and dirty, we placed an old black comforter on the floor for the actors to lay on.

After it was done, and we did our best, it still didn't look 100% convincing. But I remembered an elevator I was in on vacation two years ago that was being remodeled with new fabric, and it was attached to the top of the wall and the fabric hung down the the floor, where it was held in place. So I merely changed the script to reflect that.

I will have more info on this on the DVD. Andy and I actually go through the whole room and show you how we did it.

We will finish shooting this and Gracious Host next month and I hope to have them online by Memorial Day. The Tome will pick up in June.

Keep your eyes peeled here for an important announcement later on.

Cheers!

No comments: